
| Design Specification | Material | Weight |
| Plate : SA387-11 CL.1 or SA387-22 Cl.2 Forging : SA336-F11 CL.2, SA182-F11 CL.2 |
167 ~ 533 Ton |
| Experience List | Customer | Project | Description | Material | Weight (Ton) | Year |
| GS Engineering & Construction |
Lidong Aromatics |
CCR Platforming Reactor #1~#4 (Moon Type) |
A387-11 Cl.1 |
300 | 2005 |
| SK Engineering & |
ATC Aromatics Complex 2 | CCR Platforming Reactor (Moon Type) |
A387-11 Cl.1 |
330 | 2006 |
| GS Caltex Corporation | CCR Revamping | CCR Revamping (Moon Type) |
A387-11 Cl.1 |
175 | 2007 |
| SK Engineering & Construction |
KPPC Aromatics |
CCR Platforming Reactor (Moon Type) |
A387-11 Cl.2 |
533 | 2007 |
| Bechtel-Jacobs Joint Venture |
Motiva Crude Expansion |
CCR Platforming Reactor (Optimizer Type) |
A387-22 Cl.2 |
468 | 2008 |
| Daelim Industrial Co., LTD. |
Yanbu | CCR Platforming Reactor (Optimizer Type) |
A387-11 Cl.1 |
281 | 2011 |
| SK Engineering & Construction |
Jurong Aromatic |
CCR Platforming Reactor (Moon Type) |
A387-11 Cl.1 |
244 | 2012 |
| Hyundai Engineering & Construction |
V-Project | CCR Platforming Reactor (Moon Type) |
A387-11 Cl.1 |
168 | 2013 |
| UOP | Roseneft | CCR Platforming Reactor (Moon Type) |
A387-11 Cl.1 |
167 | 2013 |
| UOP | Antipinsky Russia |
CCR Platforming Reactor (Moon Type) |
A387-11 Cl.1 |
100 | 2013 |
| Technip Malaysia | NSRP | CCR Platforming Reactor (Optimizer Type) |
A387-22 Cl.2 |
336 | 2015 |